Starter Vape Kit inspection — workbook
This page is for convenience store chains who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
Published 25 November 2025 · VapeWholesaleHub · Reading time 5 min
Labels, closures and traceability
A starter vape kit programme only works when three numbers agree: your shelf price, your reorder cycle and your defect tolerance. Change one and the plan moves. We build assortments around those three and we say so up front rather than after the invoice.
If you sell into a market that requires child-resistant packaging, say so at quotation stage. Retrofitting a CR closure onto a finished bottle design usually means a new mould and a four week delay.
Age verification is not only a website problem. Retail packaging, shelf placement and staff scripting all carry compliance weight, and auditors increasingly ask for evidence of all three.
Transit, consolidation and timing
Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 15 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
Keeping the second shipment identical
Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.
Reorders are the real test of a supplier. If the second shipment does not match the first, the relationship is over regardless of price, so we treat the reorder as the actual deliverable.
- Document pack prepared per destination market
- Standing reorder schedule with a fixed cut-off
- Artwork proof plus physical dummy for custom packaging
- Batch codes traceable from carton back to production date
- Reference sample retained from every batch
- Private label files archived for future rebrands
Batch consistency and why it matters
Every batch is pulled from running production, not from a display shelf. We check draw resistance, airflow balance, charge behaviour, leak performance after a temperature shift, finish quality and carton integrity, and we keep the pull records against the order number.
Battery safety is not a marketing line. Cells are matched by capacity and internal resistance before assembly, charging boards are checked for cut-off voltage, and any unit that fails the cut-off test never reaches packing.
Specification summary
| Battery | 800 mAh |
| Pod capacity | 2.0 ml |
| Coil resistance | 0.8 ohm |
| Included | Device, 2 pods, cable |
| Charging | USB-C 5V/1A |
| Packaging | Retail box |
| Minimum order | 200 units per SKU, mixed cartons allowed |
| Lead time | 22 working days after artwork approval |
None of this is complicated. It is just written down, which is more than most buyers get before they wire a deposit.
Frequently asked
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
How long does production take?
Around 15 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz